PROJECT 3
< A 'LIVE' CAPSULE >
For this project ,we need to develop and produce effective and well thought out compact living design through proper precedent studies and guided by ergonomic considerations. We also need to consider eco-friendliness and the effectiveness of our design. Participating in not only the design but also branding and idea of this new trend. This project requires us to design a cafe out of the combination of two shipping containers, one with the dimension 2400mm (w) x 12000mm(l) x 2850mm(h) and 2400mm (w) x6000mm (l) x 2850(h) at sekeping serendah.
My located was choosed beside and flooting the swimming pool, extension with the car park.and also have a glass stage and long corridor attach with car park and the entrance of cafe. The three site of building was arounf the forest and placed at slope , surpported by beams. Main material was glass and steel. My window display was placed at balcony beside the staircase so people could view the process of making fruit tea while they walk down to activity area.
Menu : Malaysia local fruit tea & local fruit salad.
TASK 01
DRAWING & IDEA EXPLORE
EXTERIOR DESIGN | INTERIOR DESIGN | INTERIOR THEME : LABORATORY |
---|---|---|
INTERIOR DESIGN DETAILS | ||
WHO QUESTION & FUN-FACTORS | CONPONENT DESIGN , SITE LOCATION & IDEA RESEARCH | FLOOR PLAN TURTORIAL |
FLOOR PLAN & SECTION 1 | SECTION 2 | ACTIVITY PROGRAMN |
FLOOR PLAN TURTORIAL | FLOOR PLAN TURTORIAL | FLOOR PLAN |
SECTION 1&2 , PRESPECTIVE | FLOOR PLAN TURTORIAL | FLOOR PLAN TURTORIAL |
FLOOR PLAN TURTORIAL | ELEVATION TUTORIAL | FLOOR PLAN TURTORIAL |
TASK 02
MODEL PROGRESS
NO.1MOCK-UP MODEL 1 | NO.2MOCK-UP MODEL 1 | NO.3MOCK-UP MODEL 2 |
---|---|---|
NO.4FINAL MODEL | NO.5FINAL MODEL | NO.6FINAL MODEL |
NO.7FINAL MODEL | NO.8RE-SUBMISSION : EXPERIMENT AREA | NO.9RE-SUBMISSION : KITCHEN & ENTRANCE |
NO.10RE-SUBMISSION : BALCONY & WINDOW DISPLAY | NO.11RE-SUBMISSION : PROMO AREA | NO.12RE-SUBMISSION : PROMO AREA |
NO.13RE-SUBMISSION : BALCONY | NO.14RE-SUBMISSION : EXTERIOR PRESPECTIVE | NO.15RE-SUBMISSION : FRONT ELEVATION |